"S" gauge Signal bridge made from Plasticville's  "O" gauge
There are 11 bridges on my layout some spliced to span more that five tracks.
These picture show some of the details of how they are made.

Converted signal heads

Signal heads are bulbs are replaced with LEDs

The top railings are also removed.

Mounting pins are from the original sides going through holes drilled in the new base slipping into holes in the train board.  Slotted holes are for the wires and connectors. The template tool makes drilling a snap.
Wiring fed into train board and ready to place bridge mounting pins into holes.


Back to Home Page